Presale Completion Checklist: From Deficiency Walk-Through to Closing
A presale can take two or three years from signing to keys, and the completion stage is where buyers most often scramble: how the deficiency walk-through works, how much cash to have ready, and which documents actually matter. Here is the whole completion sequence as a checklist, in time order. For the earlier stages, see our presale assignment guide and the presale hub. This is the general BC process — your contract and disclosure statement govern your purchase.
1. Three to six months out: money and mortgage first
- Final mortgage approval: Your signing-day pre-approval is long expired. Re-apply for final approval — and note that if the completion appraisal comes in below your contract price, the lender may lend less, with the gap payable in cash.
- Assemble the balance: Balance due = contract price − deposits paid − mortgage amount, plus taxes and closing costs (section 3). Do not cut the cash buffer to zero.
- Read every disclosure amendment: Developers must deliver amendments to the disclosure statement for material changes. Read them — changes to size, layout or completion timing can carry contract rights. Ask your lawyer the moment anything looks off.

2. The deficiency walk-through: bring a system
The developer schedules a walk-through before completion: you inspect walls, floors, doors and windows, kitchen and bath fixtures, plumbing and heating, and every defect is recorded on a signed deficiency list. Practical tips: bring a tape measure and your phone flashlight, run every tap and appliance, check tile and caulking, and photograph everything beyond the list as well. New homes carry mandatory 2-5-10 warranty insurance (2 years on labour and materials, 5 on the building envelope, 10 on structure) — your walk-through record is the foundation document for later warranty claims, so keep your copy.

3. Completion day: the full bill
- GST: New homes attract 5% GST on the contract price (check whether your contract price is quoted net or gross of GST). Eligible first-time buyers can claim the federal GST rebate for new housing — up to $50,000 back on homes up to $1M, phasing out between $1M and $1.5M.
- Property transfer tax: The Newly Built Home Exemption can eliminate PTT on a new home up to $1.1M (partial relief to $1.15M), subject to occupancy and other conditions; otherwise regular PTT rates apply.
- Everything else: Legal/notary fees, strata move-in fees and deposits, utility connections, and any developer charges set out in the disclosure statement.
- Sequence: Keys come after your lawyer completes the funds transfer and title registration. Occupancy permission and legal completion are not the same thing — your contract sets the order.
4. Your signing-stage rights, in hindsight
BC presales are governed by the Real Estate Development Marketing Act (REDMA): you had a 7-day rescission period when you signed (counted from the later of signing and acknowledging the disclosure statement), and your deposits were held in trust or covered by deposit protection insurance. At completion, the tools that still protect you are the amendment record, the deficiency list, and the warranty — all of which depend on keeping the paperwork.
I’m Jack Zhu, a REALTOR® with RE/MAX Select Properties, licensed since 2012 (14 years). If a presale completion is coming up and you want a second pair of eyes on the checklist — or you are weighing a completed home against a presale — call me at 604-889-1640.
This article is general information only. Taxes and rules are as published by the Government of BC, the Government of Canada and BCFSA; your contract, disclosure statement and lawyer’s advice govern your case. It is not tax, legal or investment advice.